CCRC&CCECC ETIHAD RAILWAY PROJECT

Release Date:2023-07-29
Share to:

CCRC&CCECC ETIHAD RAILWAY PROJECT

Shipper: CHINA CIVIL ENGINEERING CONSTRUCTION
Consignee: CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION-DUBAI BRANCH
Scope of Work:​ Shipment of 4 Diesel Locomotives from Port to Project Site
Port of Loading: Tianjin, China
Port of Discharge: Jebel ali , Dubai, U.A.E
Key Challenges:​ Each diesel locomotive weighs 141 tons and is 20 meters in length. It is oversized and overweight, exceeding the load capacity of bridges along the delivery route and is prohibited from daytime road travel. Additionally, a direct ship-to-trailer transfer at the port must be arranged, and tax-exempt customs inspection procedures are required.